← Back
Details
Date
2017-06-28
Aircraft
N226JA
Type
airframe
Time Readings
100HRS 100
Mechanic
Senyon Ropero
Cert #
9R9R295C
Source
N226JA/Engine Maintenance Records/CCF05072026_0017.pdf, page 1
OCR Conf.
Description
The Fuel Primer line were inspected and pressure tested. Leaks and major corrosion was found on the primer line. Corrective action was taken at sights of leaks. Fittings were salvaged and the corroded tube was removed and replaced. Material Used: Stainless Steel .125" Tube Heat#YX1407-586. The repair method and techniques as well as all materials utilized in the performance of such repair are in accordance and approved under AC 43.13-1b. 14 CFR 43.9 Return to Service. Certifies that unless otherwise specified in Block 13, the work identified in Block 12 and described in Block 13 was accomplished in accordance with Title 14, Code of Federal Regulations, part 43 and in respect to that work, the items are approved for return to service.
AD / SB / FAR References
TypeNumberDescription
OTHER AC 43.13-1b Repair method and techniques approval reference
FAR 14 CFR 43.9 Return to Service
Components
ComponentPart #Serial #Qty
C-172 LINE ASSY 1700121-98 N/A 1
Raw OCR Text
(empty)