1. Removed and replaced right main tire with new P/N 6.00-6 S/N B3E43717.
2. Removed and replaced main landing gear tire with new P/N 5.00-5 S/N B3D4415.
All maintenance performed on this Aircraft was conducted in reference with Cessna 172 Service Manuals as revised and the current regulations of the Federal Aviation Administration and is approved for return to service with respect to the work performed.